The mulch has [finally] been spread. Drip irrigation has been installed. Stormwater entry pits have been re-configured to direct stormwater onto the trees. Tree controls have been initiated for these magnificent trees in the Railway Reserves through the review of Heritage Overlay 1.
Thursday, September 15, 2011
Looking after the trees in the Railway Reserves
The mulch has [finally] been spread. Drip irrigation has been installed. Stormwater entry pits have been re-configured to direct stormwater onto the trees. Tree controls have been initiated for these magnificent trees in the Railway Reserves through the review of Heritage Overlay 1.
Labels:
Parks,
Port Melbourne
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment