The temporary opening at Swallow/Ross/Byrne, created during the construction of the Melbourne main sewer, is now being closed. The re-instated road opening makes it very clear through its design that this road is for local traffic only. The pedestrian path goes seamlessly from Garden City Reserve towards the light rail and Bay St. The works in the vicinity include renewed kerb and channel, footpaths with new naturestrips, and smoothly re-surfaced road.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment